{"id":660,"date":"2022-08-01T16:09:29","date_gmt":"2022-08-01T14:09:29","guid":{"rendered":"https:\/\/www.akeron.com\/tarko\/2022\/08\/01\/cost-estimation-for-engineering-companies-the-akeron-project-business-automation-solution\/"},"modified":"2024-05-10T12:26:59","modified_gmt":"2024-05-10T10:26:59","slug":"cost-estimation-for-engineering-companies-the-akeron-project-business-automation-solution","status":"publish","type":"post","link":"https:\/\/www.akeron.com\/tarko\/en\/cost-estimation-for-engineering-companies-the-akeron-project-business-automation-solution\/","title":{"rendered":"Cost Estimation for Engineering Companies: the Akeron Project Business Automation solution"},"content":{"rendered":"
According to the\u00a0Project Management Institute<\/strong>, the failure of many engineering projects can be traced back to the\u00a0quotation management phase<\/strong>. Another study, conducted by the\u00a0University of Aalborg<\/strong>\u00a0(Denmark) also confirms that in nine out of ten projects, costs are underestimated and have a negative impact on profits (Source PMI.org<\/em>).<\/p>\n To overcome this critical issue, engineering companies need a software solution that can support the\u00a0quotation phase<\/strong>\u00a0in an\u00a0analytical and timely manner<\/strong>.<\/p>\n Akeron Project Business Automation<\/strong>\u00a0is the ideal solution: it allows you to\u00a0manage the entire project life cycle<\/strong>\u00a0and includes features dedicated to the correct definition and allocation of resources and time.<\/p>\n First of all, the system allows you to set up the\u00a0Corporate Organizational Chart<\/strong>, from which you can quickly identify the availability of all human resources and their related roles in the company.<\/p>\n The second preliminary element enables establishment of the typical\u00a0Phases<\/strong>\u00a0to be evaluated and managed in a project.<\/p>\n These two aspects are preparatory to the definition of the\u00a0Service<\/strong>\u00a0Catalogue<\/strong>, which allows the company to codify the elements of its offer, including a more or less detailed description and definition of the specifics, which are useful to enhance the economic proposal.<\/p>\n As such, the\u00a0estimation phase<\/strong>\u00a0can be concretized in the\u00a0Sales<\/strong>\u00a0Module<\/strong>\u00a0for each prospect or customer, and reviewed by the system according to the object of the offer and analysis of all the elements that would have impact at a company level, should the proposal be accepted.<\/p>\n Akeron Project Business Automation<\/strong>\u00a0allows a preliminary\u00a0assessment<\/strong>,\u00a0precisely targeted\u00a0<\/strong>and\u00a0analytical<\/strong>\u00a0of the\u00a0costs\u00a0<\/strong>attributable to a specific project order, to enable definition of an\u00a0appropriate<\/strong>\u00a0mark-up<\/strong>.<\/p>\n If the\u00a0feasibility study<\/strong>\u00a0is positive, the system allows the creation of an\u00a0Offer Document<\/strong>, based on a predefined template, that can be edited and shared with the customer\u00a0via e-mail<\/strong>\u00a0or through the use of the\u00a0Reserved Area<\/strong>.<\/p>\n Finally, the solution allows\u00a0management\u00a0<\/strong>of the\u00a0quotation<\/strong>\u00a0phase outcome<\/strong>:<\/p>\n Thanks to the support of Akeron Project Business Automation<\/b>, the\u00a0realization of a project<\/strong>\u00a0is not only\u00a0greatly simplified<\/strong>\u00a0but profit can be maximized through\u00a0precise<\/strong>\u00a0cost estimation.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":" According to the\u00a0Project Management Institute, the failure of many engineering projects can be traced back to the\u00a0quotation management phase. Another study, conducted by the\u00a0University of Aalborg\u00a0(Denmark) also confirms that in nine out of ten projects, costs are underestimated and have a negative impact on profits (Source PMI.org). To overcome this critical issue, engineering companies need […]<\/p>\n","protected":false},"author":1,"featured_media":86013,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[125,1],"tags":[102,104],"post_folder":[],"acf":[],"yoast_head":"\n\n